One address. One question. A page you can share.
Zoning. Is the use allowed on this lot, in this city.
The building problems: hood, grease trap, parking, access.
Sprinklers, restrooms, exits. A pointer, not a permit.
A low and a high, and the three things driving it. Not a bid.
The longer memo. One site, one use.
A second use on the same suite is $150 on the clinic or restaurant check, $250 on the code check, $400 on a second memo site.
The cost range is $250 if it follows a check. The clinic check, the code check, and the cost range together are $1,200.
Need it within two business days? Add 50%. I do not need drawings to start.
A yes isn’t a permit. A no doesn’t come with a list of other options.
Commercial brokers, landlords, tenants, developers, and anyone opening a business.
I’m Adam Gregory Rhoades, an architect licensed in Tennessee. I’ve spent more than 12 years working across nearly every kind of building. Now I answer one question about one property, plainly, before you commit to it.
A written answer to one question, from a Tennessee architect, before you spend time on a tour or sign a lease.
Think of it as a first look from an architect. It tells you whether to keep going. It doesn’t replace the permit, the survey, the bid, or a sealed set.
It’s written for you and your decision. Share it with anyone helping you decide. If someone else needs to rely on it, let’s talk.
Middle Tennessee. Each city has its own rules.